top of page
![](https://static.wixstatic.com/media/079511_a5ecbd23298442d9aa8574eae1e91415~mv2.jpg/v1/fill/w_539,h_400,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/079511_a5ecbd23298442d9aa8574eae1e91415~mv2.jpg)
East Huntington Bridge, West Virginia
In April 2019, ABI traveled to West Virginia with the RAS and ADI device to inspect the East Huntington Bridge. This large cable-stayed bridge is about 5,000 ft. long. We were able to complete the entire delamination and surface crack inspection in just 20 minutes with only a rolling lane closure! A job that would normally take at least 1 month and would require full lane closures. We'd like to thank WVDOH for having us out to help tackle this difficult bridge.
![](https://static.wixstatic.com/media/079511_6bef69d525144d9f84dca652aea01582~mv2.jpg/v1/fill/w_980,h_622,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/079511_6bef69d525144d9f84dca652aea01582~mv2.jpg)
![](https://static.wixstatic.com/media/079511_173a4ba0e71945479ffc79834198ce19~mv2_d_2084_2475_s_2.jpg/v1/fill/w_980,h_1164,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/079511_173a4ba0e71945479ffc79834198ce19~mv2_d_2084_2475_s_2.jpg)
![](https://static.wixstatic.com/media/079511_a5ecbd23298442d9aa8574eae1e91415~mv2.jpg/v1/fill/w_980,h_727,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/079511_a5ecbd23298442d9aa8574eae1e91415~mv2.jpg)
![](https://static.wixstatic.com/media/079511_6bef69d525144d9f84dca652aea01582~mv2.jpg/v1/fill/w_980,h_622,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/079511_6bef69d525144d9f84dca652aea01582~mv2.jpg)
1/3
bottom of page