East Huntington Bridge, West Virginia
In April 2019, ABI traveled to West Virginia with the RAS and ADI device to inspect the East Huntington Bridge. This large cable-stayed bridge is about 5,000 ft. long. We were able to complete the entire delamination and surface crack inspection in just 20 minutes with only a rolling lane closure! A job that would normally take at least 1 month and would require full lane closures. We'd like to thank WVDOH for having us out to help tackle this difficult bridge.